Skip to Content
Geographic Coordinate Tools-V1.0More
AustraliaSydneysydney metro map

Sydney Metro Route Map

Sydney Metro Map, Sydney Rail Transit Map

Introduction to Sydney Metro

悉尼地铁是澳大利亚新南威尔士州悉尼的快速交通系统。2019年5月开通的西北线是悉尼地铁的第一条线路,连接Tallawong和Chatswood。悉尼地铁是澳大利亚第一个全自动无人驾驶地铁系统,采用单层车厢设计,提供高频率服务。

Sydney Metro Line Overview

Sydney Metro Line Details

Summary Table of Sydney Metro Lines

Below is a summary table of Sydney, Australia’s metro lines:

LineOpening YearTypeLength (km)Number of StationsStart StationEnd StationPassenger Volume
M1 Northwest - Bankstown LineFirst segment opened on May 26, 2019; full line opened on August 19, 2024Fully Automated Rapid Transit5221TallawongSydenhamNo exact data available; projected to carry 22,000 passengers per hour in one direction by 2031
M2 Western Sydney Airport LineScheduled to open in 2026Fully Automated Rapid Transit236St MarysBradfieldProjected to reach 31 million annual passengers by 2036
M3 Sydney West LineScheduled to open in 2030Fully Automated Rapid Transit249WestmeadHunter StreetProjected to reach 38 million annual passengers by 2036

Station Names and Operation Schedules of Sydney Metro Lines

Below is a compiled table of station names, departure schedules, and last departure times for Sydney’s three metro lines (data as of April 2025):

1. Line M1 (Northwest Line and Extension)

LineStation Names (by operational status)Departure ScheduleLast Departure Time
M1 LineOperational Segment (Tallawong to Sydenham):
Tallawong, Rouse Hill, Kellyville, Bella Vista, Norwest, Hills Park, Castle Hill, Cherrybrook, Epping, Macquarie University, North Ryde, Chatswood, Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal, Central, Waterloo, Sydenham.

Under Construction (Sydenham to Bankstown):
Marrickville, Dulwich Hill, Hurlstone Park, Canterbury, Campsie, Belmore, Lakemba, Wiley Park, Punchbowl, Bankstown.
Peak Hours (Monday–Friday):
Every 4 minutes (morning peak: 6:30–9:00, evening peak: 16:30–19:00).

Off-Peak Hours:
Every 10 minutes (6:00–6:30, 9:00–16:30, 19:00–23:00).

Weekends & Public Holidays:
Every 10 minutes (6:00–23:00).
Monday–Thursday:
Last train departs Tallawong at approximately 00:58, departs Sydenham at approximately 00:58.

Friday–Saturday:
Last train departs Tallawong at approximately 01:58, departs Sydenham at approximately 01:58.

Sunday:
Last train departs Tallawong at approximately 00:58, departs Sydenham at approximately 00:58.

2. Sydney Metro West Line

LineStation Names (planned)Departure ScheduleLast Departure Time
West LineWestmead, Parramatta, Sydney Olympic Park, North Strathfield, Burwood North, Five Dock, Bayside, Pyrmont, Hunter Street (Sydney CBD).Under Construction: Scheduled to open in 2032; specific operation times yet to be announced.
Planned Direction:
Every 4–6 minutes during peak hours, every 10 minutes during off-peak hours.
Under Construction: Expected to operate until around 1:00 AM, similar to Line M1.
Final times subject to official release.

3. Sydney Metro Airport Line

LineStation Names (planned)Departure ScheduleLast Departure Time
Airport LineSt Marys, Orchard Hills, Luddenham, Airport Terminal, Airport Business Park, Bradfield.Under Construction: Scheduled to open in 2026; specific operation times yet to be announced.
Planned Direction:
Every 5–8 minutes during peak hours, every 10–15 minutes during off-peak hours.
Under Construction: Expected to align with airport operating hours (typically 5:00 AM–11:00 PM).
Final times subject to official release.

References & Notes

  1. Operational Status of Line M1:
  • Operational Segment: Runs from Tallawong to Sydenham, spanning 52 km with 21 stations. Uses fully automated driverless trains, with a 4-minute frequency during peak hours and 10-minute frequency during off-peak hours.
  • Under Construction Extension: From Sydenham to Bankstown, spanning 14 km, upgrading existing T3 line stations. Scheduled for completion in 2025, forming the full M1 line (Tallawong to Bankstown).
  1. Progress of West Line and Airport Line:
  • West Line: A 24-km underground line connecting Parramatta and Sydney CBD, planned for 2032. Station designs integrate with urban development (e.g., Parramatta station will include mixed-use projects).
  • Airport Line: A 23-km line connecting St Marys to Western Sydney International Airport, scheduled to open in 2026 alongside the airport, serving the airport and surrounding commercial areas.
  1. Operation Time Reference:
  • Line M1 operates daily from approximately 5:00 AM to 1:00 AM, with slight variations in last train times by direction and day.
  • Operation times for under-construction lines may follow Line M1’s model but are subject to official announcements.
  1. Real-Time Enquiries:
  • Latest schedules can be checked via the Sydney Metro官网 or transport apps (e.g., Moovit, TripView).
  • Progress of under-construction lines can be tracked via the Transport for NSW announcements.

For further details on specific lines (e.g., transfer guides, fare policies), please specify your needs.

Last updated on: