Introduction to the Milan Metro

米兰地铁是意大利米兰的快速交通系统,于1964年开通。目前有5条线路:M1(红线)、M2(绿线)、M3(黄线)、M4(蓝线)和M5(紫线),全长约100公里,设有113个车站。这是意大利最大的地铁系统,由米兰交通公司(ATM)运营。

Overview of Milan Metro Lines

Summary Table of Milan Metro Line Information

The Milan Metro system is one of the largest metro networks in Italy. Below is a summary table of its detailed information:

LineYear OpenedTypeLength (km)Number of StationsStarting StationTerminating StationDaily Ridership
M1 (Red Line)1964Underground heavy rail27.038Sesto 1° Maggio FSBisceglie/Rho Fieramilano~450,000
M2 (Green Line)1969Underground heavy rail39.435Assago Milanofiori Forum/AbbiategrassoCologno Nord/Gessate~330,000
M3 (Yellow Line)1990Underground heavy rail16.721ComasinaSan Donato~270,000
M4 (Blue Line)2022Fully automated metro15.021Linate AeroportoSan Cristoforo~150,000
M5 (Purple Line)2013Fully automated metro12.919BignamiSan Siro Stadio~180,000

Additional Notes:

  1. Lines and Operations
  • The Milan Metro system consists of 5 lines, spanning over 100 km with 134 stations, making it the largest metro network in Italy.
  • Lines M1 (Red) and M2 (Green), the oldest lines, opened in 1964 and 1969 respectively, forming the backbone of the network.
  • Line M4 (Blue), the newest line, began partial operations in 2022 and was fully operational by 2023, connecting downtown Milan to Linate Airport.
  • Line M5 (Purple), Milan’s first fully automated driverless metro line, started partial service in 2013 and was fully completed in 2015.
  1. System Features and Development
  • Operated by ATM (Azienda Trasporti Milanesi), the Milan Metro is the busiest metro system in Italy, with a daily ridership exceeding 1.3 million.
  • The fare system is zone-based, with a single ticket costing €2 (valid for 90 minutes). Multiple ticket options are available, including day, weekly, and monthly passes.
  • The system is undergoing several expansion projects, including extensions of Line M1 to Baggio and Line M4 to Segrate, as well as the planned Line M6 (Pink Line).
  1. Transport Connections
  • The Milan Metro integrates with the city’s railway (S-Bahn), trams, and buses to form a comprehensive public transport network.
  • Lines M1 and M2 offer transfers to the Malpensa Express at Cadorna Station for travel to Malpensa Airport.
  • Line M4 provides direct service to Linate Airport, offering convenient airport access for passengers.

References:

Metro Line Stations and Schedule

M1 (Red Line)

Station NameTransfer Information
Sesto 1° Maggio FSTransfer to FS railways
Sesto Marelli
Villa San Giovanni
Precotto
Gorla
Turro
Rovereto
Pasteur
LoretoTransfer to Line M2
Lima
Porta VeneziaTransfer to S-Bahn
Palestro
San BabilaTransfer to Line M4
DuomoTransfer to Line M3
Cordusio
Cairoli
Cadorna FNTransfer to Line M2, Malpensa Express
Conciliazione
Pagano
Buonarroti
Amendola
LottoTransfer to Line M5
QT8
Lampugnano
Uruguay
Bonola
San Leonardo
Molino Dorino
Pero
Rho FieramilanoTerminus (Rho Fiera direction)
De Angeli(Bisceglie branch)
Gambara
Bande Nere
Primaticcio
Inganni
BisceglieTerminus (Bisceglie direction)

Schedule

DirectionFirst TrainLast TrainHeadway
Sesto 1° Maggio FS → Rho Fieramilano5:400:30Peak: 2-3 minutes
Off-peak: 4-6 minutes
Night: 8-10 minutes
Sesto 1° Maggio FS → Bisceglie5:400:30Peak: 2-3 minutes
Off-peak: 4-6 minutes
Night: 8-10 minutes
Rho Fieramilano → Sesto 1° Maggio FS5:500:40Peak: 2-3 minutes
Off-peak: 4-6 minutes
Night: 8-10 minutes
Bisceglie → Sesto 1° Maggio FS5:450:35Peak: 2-3 minutes
Off-peak: 4-6 minutes
Night: 8-10 minutes

M2 (Green Line)

Station NameTransfer Information
Assago Milanofiori ForumTerminus (Assago direction)
Assago Milanofiori Nord
Famagosta
AbbiategrassoTerminus (Abbiategrasso direction)
Romolo
Porta Genova FSTransfer to FS railways
Sant’Agostino
Sant’Ambrogio
Cadorna FNTransfer to Line M1, Malpensa Express
Lanza
Moscova
Garibaldi FSTransfer to Line M5, S-Bahn
Gioia
Centrale FSTransfer to Line M3, FS railways
Caiazzo
LoretoTransfer to Line M1
Piola
Lambrate FSTransfer to FS railways
Udine
Crescenzago
Cimiano
Sant’Agata
Cascina Gobba(Branch point)
Vimodrone(Cologno branch)
Cascina Burrona
Cologno Sud
Cologno Centro
Cologno NordTerminus (Cologno direction)
Cascina Gobba(Branch point)
Cernusco sul Naviglio(Gessate branch)
Villa Fiorita
Cassina de’ Pecchi
Bussero
Villa Pompea
Gorgonzola
GessateTerminus (Gessate direction)

Schedule

DirectionFirst TrainLast TrainHeadway
Assago/Abbiategrasso → Cologno Nord5:450:35Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes
Assago/Abbiategrasso → Gessate5:450:35Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes
Cologno Nord → Assago/Abbiategrasso5:400:30Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes
Gessate → Assago/Abbiategrasso5:350:25Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes

M3 (Yellow Line)

Station NameTransfer Information
ComasinaTerminus
Affori FNTransfer to FS railways
Affori Centro
Dergano
Maciachini
ZaraTransfer to Line M5
Sondrio
Centrale FSTransfer to Line M2, FS railways
Repubblica
Turati
Montenapoleone
DuomoTransfer to Line M1
Missori
Crocetta
Porta Romana
Lodi TIBB
Brenta
Corvetto
Porto di Mare
Rogoredo FSTransfer to FS railways
San DonatoTerminus

Schedule

DirectionFirst TrainLast TrainHeadway
Comasina → San Donato5:450:30Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes
San Donato → Comasina5:400:25Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes

M4 (Blue Line)

Station NameTransfer Information
Linate AeroportoTerminus (Airport)
Repetti
Forlanini
Argonne
Susa
DateoTransfer to S-Bahn
Tricolore
San BabilaTransfer to Line M1
Sforza Policlinico
Santa Sofia
Vetra
De Amicis
Sant’AmbrogioTransfer to Line M2
Coni Zugna
California
Bolivar
Tolstoj
Frattini
Gelsomini
Segneri
San CristoforoTerminus

Schedule

DirectionFirst TrainLast TrainHeadway
Linate Aeroporto → San Cristoforo6:000:30Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes
San Cristoforo → Linate Aeroporto5:500:20Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes

M5 (Purple Line)

Station NameTransfer Information
BignamiTerminus
Ponale
Bicocca
Ca’ Granda
Istria
Marche
ZaraTransfer to Line M3
Isola
Garibaldi FSTransfer to Line M2, S-Bahn
Monumentale
Cenisio
Gerusalemme
Domodossola FNTransfer to FN railways
Tre Torri
Portello
LottoTransfer to Line M1
Segesta
San Siro Ippodromo
San Siro StadioTerminus

Schedule

DirectionFirst TrainLast TrainHeadway
Bignami → San Siro Stadio5:500:30Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes
San Siro Stadio → Bignami5:450:25Peak: 3-4 minutes
Off-peak: 5-7 minutes
Night: 9-12 minutes

Additional Information

  1. Line Features
  • Line M1 (Red) is the busiest metro line in Milan, connecting the city center to key areas including the exhibition center and stadiums.
  • Line M2 (Green), the longest metro line, has two branches leading to Cologno and Gessate.
  • Line M4 (Blue), the newest line, uses fully automated driverless technology and links Linate Airport to the city center.
  • Line M5 (Purple), Milan’s second driverless metro line, connects Bignami to San Siro Stadium.
  1. Service Adjustments
  • Weekend Operations: On Fridays and Saturdays, the last trains for M1, M2, and M3 are extended until approximately 2:00 AM.
  • Special Events: Additional trains may be added during major events (e.g., football matches, concerts), especially on lines M1 and M5 serving San Siro Stadium.
  1. Transfers and Connections
  • Centrale FS Station: Offers transfers to Lines M2 and M3, as well as regional and high-speed railways.
  • Garibaldi FS Station: Provides transfers to Lines M2 and M5, along with S-Bahn and regional trains.
  • Airport Connections: Line M4 goes directly to Linate Airport; Malpensa Express from Cadorna Station serves Malpensa Airport.
  1. Fares and Ticketing
  • Single ticket: €2, valid for 90 minutes with transfers between metro, buses, and trams in the urban area.
  • Day pass (24 hours): €7, 3-day pass (72 hours): €13, weekly pass (7 days): €17.50.
  • Contactless payment (via card or mobile, e.g., Apple Pay, Google Pay) and ticketing through the official ATM app are supported.

Data Notes

  • Station Names: Based on official Milan Metro information and transport guides, including the latest stations opened in 2025.
  • Operating Hours: Refer to ATM’s official data; times may vary slightly due to seasonal adjustments.
  • Expansion Plans: Extensions of Line M1 to Baggio and Line M4 to Segrate are underway, expected to finish between 2026–2027.

For real-time operational information, visit the official Milan Metro website (ATM Milano) or use the official ATM app.